Finish with a commissioning record, a historical-data check and a fault-finding sequence that preserves the original readings.

Written course for development review; live pulse commissioning and recording pending.

Before you start

Keep one record for each source

The configuration record should let another technician trace a reported total back to its physical source and mathematical meaning. Use it for electricity as well as water and gas.

RecordWhat to retain
IdentityMeter model, serial/asset identity, firmware, PAS version, external meter identity and fitted input module.
Signal and quantityDI number, output type, pulse/KYZ mode, polarity, debounce; electricity direction or water/gas volume basis.
ScalingOriginal pulse specification, converted units per pulse, source/target, multiplier and engineering unit. Record CT/PT meaning for electrical readings.
BaselineStart/end timestamps, raw counts and accumulated totals; existing external-meter offset; any reset or replacement.
RecordingSelected log field, cumulative or interval definition, trigger, period, timezone, archive location and retained span.
AcceptanceExpected increment, observed increment, difference, test conditions, explanation and responsible reviewer.

Source 1 · Source 2 · Source 3

Choose what the historical record must answer

For consumption over time, a cumulative volume or energy field can be useful when its source, unit and multiplier are clear. Use successive differences to calculate interval consumption only while the total remains continuous. Preserve reset and configuration-change context.

Select a recording interval for the application and available memory. Five-minute, fifteen-minute and thirty-minute periods are choices, not a guarantee that the records meet a particular market or billing requirement. Confirm the selected quantity, alignment and retained rows.

For EM133-XM, inspect the intended Data Log 1, 2 or 3 parameter list and trigger destination; do not assume that a log number fixes its purpose. Use the separate Data Log 16 lesson for Billing/TOU daily profiles. If the desired volume field is unavailable in a recorder, resolve the supported route rather than substituting a similarly named electrical field.

Source 4 · Source 5 · Source 1

Upload before clearing or repartitioning

Use Logs > Upload Logs and inspect the saved database: correct device, fields, units, timestamps, earliest/latest records and continuity. Save the current setups separately. Only a checked archive establishes what was preserved.

Energy totals, pulse counters, demand values and log files have different reset targets. Clearing logs is not a method of zeroing a water meter, and resetting a counter is not a method of fixing a bad pulse factor. Review the exact operation and its scope before any authorised reset or memory change.

Source 3 · Source 5

Follow the symptom to the right check

Begin with identity and the full signal chain. Change one justified setting at a time on an authorised setup, then repeat a known-increment test. Do not tune a multiplier merely to conceal a signal problem.

SymptomNext discriminating check
No raw-count incrementCheck external output activity, fitted input, compatible signal/rating, wiring diagram, source assignment and pulse width/rate. A successful Ethernet ping does not test the pulse input.
Raw count correct; volume wrongCheck units-per-pulse versus pulses-per-unit, L versus kL/m³, the target register and duplicate scaling.
Approximately twice the expected countCheck whether KYZ counts both edges while the source specification defines one pulse per cycle. Also investigate contact bounce; the ratio alone does not prove the cause.
Missing counts at higher rateCheck source pulse width/rate and input limits. Excessive debounce can suppress valid transitions. On EM13x the debounce setting is shared across inputs.
Volume changes but wrong channel movesTrace DI, source entry and destination together; check duplicate or swapped assignments.
Totals differ but increments agreeCheck commissioning offset and reset/replacement dates before altering scaling.
Correct live total; wrong historyCheck recorder field definition, trigger/destination, timestamps, missing rows and whether cumulative values were incorrectly summed.
Electrical energy consistently scaled incorrectlyCheck primary/secondary interpretation, CT/PT settings and read format before applying another multiplier.

Source 2 · Source 1 · Source 6 · Source 7 · Source 8

Final practice: calculate before you configure

Water exercise: output 10 L/pulse; start count 4,100; finish count 4,160. Expected increment: 60 pulses × 0.010 = 0.600 kL. Gas exercise: output 0.1 m³/pulse; 25 detected pulses. Expected increment: 2.5 m³. These calculations are the test expectations, not measured outcomes.

The proposed completion evidence is a setup readback, a matched known-increment comparison and an opened historical archive showing the intended field and period. If any part is missing, keep that part open in the commissioning record. Do not mark a missing pulse test successful because the PAS settings saved.

Source 2 · Source 1 · Source 3

Limits and checks

Check your understanding

The count is wrong. Should you adjust the multiplier until the total matches?

Show answer

No. Separate missing or extra pulses from scaling errors. Diagnose signal, edge mode and debounce first; changing a factor can hide the fault.

Source 2 · Source 1

May you clear a counter to make a commissioning screenshot look tidy?

Show answer

No. Preserve its total and use differences. A reset requires a defined purpose, preserved history and explicit authority for the affected record.

Source 5 · Source 3

Does a successful setup save prove that water/gas history is correct?

Show answer

No. Read back the setup, test a known increment and upload/open the actual records.

Source 1 · Source 3

Sources

Revision and review details
RevisionChange and reasonReview / supersedes
20261108-energy-v1
8 November 2026
Added electricity-first energy and water/gas pulse-register lessons.

Explain model-specific capacity, correct units, PAS setup and consumption checks.

Primary-source and configured Product Master consultation completed; independent artifact review follows.

None