PAS · EM133-XM memory and interval logging
Upload and verify your logs before changing memory
Upload and check the records you need before clearing a log, deleting a partition or reorganising meter memory. Keep the configuration backup and historical-log archive as separate files with clear names. A successful upload message is the start of the archive check, not its conclusion.
Source-reviewed draft; live reconfiguration and recording release pending.
Before you start
- Use the correct configured EM133-XM site and confirm communication with the intended meter.
- Agree which historical records and date range must be retained before any destructive operation.
- Have a writable archive folder and a separate location for a second copy of the checked files.
Save configuration and historical data separately
Upload Setups copies the meter's configuration into the selected site database. Upload Logs retrieves stored Event, Data and other selected logs into a log database. One does not replace the other.
Use dated filenames that identify their purpose, such as XM Config Before and XM Logs Before. Keep the original working site and previously verified archives available.
Check the selected site
Confirm the selected meter and destination site file. Enable Monitor > On line for the upload. Prepare a separate configuration-backup site file before accepting an overwrite prompt.
Upload the configuration
Select MeterSetup > Upload Setups. Read the warning and confirm that the destination is the intended backup site database. Wait for completion and retain the resulting file.
Retrieve the required history
The archive must cover the history you intend to preserve. Do not assume that records newly retrieved since an earlier upload represent everything still retained in the meter.
Choose a log database
With the intended site selected and online, open Logs > Upload Logs. Choose a new archive database and a clear folder location.
Select the required logs
Choose Select Logs. Include the Event Log and each required Data Log or daily Billing/TOU profile. Check the actual allocated XM logs rather than relying on the base-model manual's shorter file list.
Check the date range and upload
Review From and To filters against the required archive period. Retrieve the required range, start the upload and wait for it to finish. Retain any error or incomplete-upload indication for investigation.
Verify the saved file before proceeding
Recommended archive acceptance check: reopen the saved log database and examine the files themselves. An upload counter or file size alone does not demonstrate that the required records can be read.
Reopen the archive
Use PAS's log-file viewing controls to open the saved database. Confirm that each required log is present and readable.
Inspect coverage and contents
Check the earliest and latest timestamps, representative rows, parameter names and units. Compare the available record count and continuity with the intended archive period. Record and investigate gaps rather than treating them as a complete backup.
Preserve the checked copy
Save a second copy of the verified archive and its configuration backup. Record the selected meter, capture time, archived range and any unresolved gap in your maintenance record.
Stop if verification fails
If the upload fails, the archive cannot be reopened or the required history is missing, stop before any clear, delete or repartition command. Resolve the archive problem first.
Choose the exact operation after the archive passes
Monitor > Reset contains separate operations for logs, energy, maximum demands and counters. Clear Event Log, Clear Data Log and Clear All Log Files have different scopes. Read the actual confirmation and affected-file list before proceeding.
Do not clear every log simply because a partition change is planned. Repartitioning can put retained data at risk, but the reviewed manuals do not establish that every partition edit clears all files or requires a separate clear-all command. The operation must be justified and authorised for that meter.
Limits and checks
- This is a source-reviewed procedure, not evidence that a new archive or live memory change has been completed.
- The previous training pilot encountered a PAS report-navigation problem. That issue is not declared resolved here. If PAS cannot reopen the archive, obtain an independently verified database check before permitting destructive work.
- Menu labels and available log targets depend on the selected model, firmware and PAS version.
Check your understanding
Does Upload Setups preserve historical data logs?
The upload completed, but the saved database will not open. May memory be cleared?
Sources
- Source 1. PAS Getting Started — BG0337 Rev. A2 (opens in a new tab)
Printed/PDF page 10, sections 3.2–3.3
Setup upload updates the local site database; download sends configuration to the meter.
- Source 2. PAS Getting Started — retrieving and viewing recorded files (opens in a new tab)
Printed/PDF pages 21–22, section 6.1; pages 25–26 and 30, sections 7.1, 7.2 and 7.5
Menu procedure is documented; archive acceptance checks below are recommended engineering workflow.
- Source 3. EM13x Installation and Operation Manual — reset targets (opens in a new tab)
Printed pages 130–131 / PDF pages 133–134, section 6.1 and Figure 6-1
This older family manual documents distinct log, energy, demand and counter reset targets; inspect the actual unit's available controls.
- Source 4. EM133 / EM133-XM Modbus Reference — file organisation (opens in a new tab)
Printed/PDF pages 14–15, section 2.10; page 63, File Setup; page 69, File Transfer Registers
XM has additional conventional data-log setup entries. Reading/resetting a file position is distinct from erasing a file.
Revision and review details
| Revision | Change and reason | Review / supersedes |
|---|---|---|
| 20261108-draft-v1 8 November 2026 | Added the archive-before-memory procedure and separate configuration/log backup checks. Make a verified off-meter archive the prerequisite for destructive memory work. | Manufacturer source review complete; live demonstration and release review pending. None |