PAS · Energy registers, water and gas

Set up electrical sources and time-of-use registers

Written lesson · recording pending

Trace an electrical measurement into a billing register, give it a clear purpose, and check the calendar before relying on tariff totals.

Written course for development review; live pulse commissioning and recording pending.

Before you start

Plan the source before opening the setup

Prepare one row per required accumulator: purpose, source quantity, direction, unit, register destination and tariff requirement. For an electricity lesson, begin with active import in kWh, then active export if the application needs it. Add reactive or apparent energy only when its purpose is understood.

PRO and PM180 can totalise selected sources with addition or subtraction. Do not put water and electricity into the same sum, or combine a whole-meter total with its own phase totals. A numerical result can look plausible while representing incompatible units or duplicate energy.

Source 1 · Source 2 · Source 3

Use the PAS menu route first

The family manuals describe MeterSetup > Energy/TOU. Tab names and available rows depend on the selected model. Inspect the live configuration with a verified connection; an offline site file shows saved settings only.

  1. Keep the baseline

    Complete Upload Setups and preserve a separately named backup. Upload the required log history as well; a configuration backup is not an archive of consumption.

    Source 1 · Source 2 · Source 3 · Source 4

  2. Inspect the source assignments

    Open MeterSetup > Energy/TOU and inspect the source/register setup. Read source, target register, multiplier and units together. For an internal electrical source, the EM13x procedure fixes the source multiplier; do not add an external pulse factor to it.

    Source 1 · Source 2 · Source 3 · Source 4

  3. Check the electrical scaling

    Confirm the CT/PT configuration and whether the reading is already expressed in primary engineering units. Do not multiply an already scaled kWh reading by the CT ratio again. Changing a CT setting is a separate authorised exercise, not part of inspecting energy registers.

    Source 1 · Source 2 · Source 3 · Source 4

  4. Choose the required outputs

    Inspect the Billing/TOU register options. Enable tariff or profile functions only for the intended purpose. A daily profile and a tariff allocation are separate choices.

    Source 1 · Source 2 · Source 3 · Source 4

  5. Read back and save

    After an authorised setup change, read the settings from the meter again, then update the working offline file and keep the earlier backup. Record the time of change because the meaning of subsequent totals may differ.

    Source 1 · Source 2 · Source 3 · Source 4

Source 1 · Source 2 · Source 3 · Source 4

A tariff needs a clock and a complete schedule

TOU allocates energy according to the configured daily profiles and calendar. Check the meter’s time basis, date, season boundaries, day types, weekends and special days against the intended schedule. A correct register source with an incorrect clock can accumulate plausible values in the wrong tariff.

Tariff numbers are identifiers, not universal names for peak, shoulder and off-peak. Write down what each number means for this installation. A five-minute, fifteen-minute or thirty-minute recording interval does not automatically define a tariff switch time.

Use the model’s complete calendar procedure and inspect the period around a tariff transition. Do not change a customer tariff calendar solely to create a demonstration. Record any RTC correction and review the surrounding timestamps before comparing periods.

Source 1 · Source 2 · Source 3

Separate a total, a tariff and a profile

A summary total answers how much has accumulated in the selected register. A tariff total answers how much was assigned to a particular tariff. A profile stores historical readings or demand values according to its enabled sections. These are views of related quantities, not independent amounts to add together.

For EM133-XM, the Billing/TOU daily profile uses Data Log 16. Conventional interval records belong to the configured data recorder. Keep the register source, recording trigger, interval and units in the commissioning record. Selecting a profile checkbox alone does not establish a complete interval-data solution.

Source 5 · Source 1 · Source 6

Limits and checks

Check your understanding

Should an internal kWh billing source be given the external meter’s pulses-per-kWh factor?

Show answer

No. Internal measured energy and external pulse inputs follow different scaling paths. Verify the source type before touching a multiplier.

Source 1

Are tariff 1 and tariff 2 always peak and off-peak?

Show answer

No. Their meaning comes from the installation’s configured calendar and source assignments.

Source 1 · Source 2 · Source 3

Sources

Revision and review details
RevisionChange and reasonReview / supersedes
20261108-energy-v1
8 November 2026
Added electricity-first energy and water/gas pulse-register lessons.

Explain model-specific capacity, correct units, PAS setup and consumption checks.

Primary-source and configured Product Master consultation completed; independent artifact review follows.

None