Compare energy readings and calculate consumption

Written lesson · recording pending

Use matched readings to calculate consumption and average power, while separating resets, scaling and overlapping totals.

Written course for development review; live pulse commissioning and recording pending.

Before you start

Capture a matched start and finish

Record meter identity, register/source name, unit, timestamp, timezone and scaling at both ends of the period. Use the same register definition and a consistent clock basis. A change to source assignment, multiplier, CT/PT configuration or reset history can break the comparison.

Consumption = finish cumulative reading − start cumulative reading, provided the register remained continuous. A negative difference is a reason to investigate: it is not automatically exported energy. Check the direction-specific register, reset/replacement history and documented rollover before calculating a correction.

Source 1 · Source 2 · Source 3 · Source 4

Worked electricity example

The following readings are illustrative and refer to the same half-hour. No reset, rollover or scaling change occurred.

QuantityStart / calculationFinishResult
Import kWh12,450.2012,456.706.50 kWh imported
Export kWh340.10341.601.50 kWh exported
Calculated net exchange6.50 − 1.50—5.00 kWh net import
Calculated average imported power6.50 ÷ 0.5 h—13.00 kW over the half-hour

Source 1

Keep the calculation’s meaning

Net exchange is a calculated balance of the two directional increments in this example. It does not replace the separate import and export records, and it does not establish a bill. Tariff rates, contractual rules and the selected meter’s own net-energy definition are separate matters.

Average power equals interval energy divided by elapsed hours. Use the actual elapsed interval, not an assumed one if records are missing or timestamps changed. Do not add the 5.00 kWh net result to the 6.50 kWh import result; those quantities overlap.

Source 1 · Source 2 · Source 3

Use a practical comparison sequence

For a read-only check, select the intended energy quantities in PAS monitoring, note their units and capture the readings. Retrieve the matching historical records through Logs > Upload Logs, then open the saved archive and inspect its fields and timestamps.

Compare register increments with the corresponding interval records only after confirming whether those records contain cumulative totals, interval increments or a different quantity. Sum interval increments; take differences of cumulative totals. Summing cumulative readings greatly overstates consumption.

Check tariff increments against the summary increment only where the source, coverage period, calendar and reset history are aligned. Allow for displayed resolution and documented rounding. Investigate discrepancies rather than forcing totals to agree by clearing a register.

Source 5 · Source 6 · Source 4

Pro Tip: preserve the evidence around a change

Keep the before and after readings, setup files, source description and change time together. File dates and sizes help locate versions; they do not prove identical live totals. Readback confirms the current setting, and an uploaded record confirms retained history. Neither can reconstruct pulses or energy that were never recorded.

Source 5 · Source 4

Limits and checks

Check your understanding

A cumulative kWh reading fell. Should you call the negative difference export?

Show answer

No. Investigate reset, rollover, replacement, wrong register and scaling changes. Export normally has its own direction-specific total.

Source 1 · Source 4

Can you sum cumulative water or energy readings to obtain period consumption?

Show answer

No. Use matched differences for continuous cumulative totals. Sum records only when their definition is interval consumption.

Source 6 · Source 4

Sources

Revision and review details
RevisionChange and reasonReview / supersedes
20261108-energy-v1
8 November 2026
Added electricity-first energy and water/gas pulse-register lessons.

Explain model-specific capacity, correct units, PAS setup and consumption checks.

Primary-source and configured Product Master consultation completed; independent artifact review follows.

None