ExpertpowerSATEC Australia

EXPERTPOWER · U107

Read meter power, demand and power factor

Use Readings History to check a record and period, compare phases, zoom a profile and read timestamped power, demand and signed power factor with their limits in view.

Jump to a topic

About this recording

Recorded 2026-11-11. Emma narration. English captions are selectable in the player.

The example uses the existing SATEC Demo Site. L1, L2 and L3 are phases of the selected record; the record name does not prove the physical meter model.

The reporting period is 10 November 2026 00:00 to 11 November 2026 00:00 as displayed by XPW. This screen uses month-first dates.

The film includes visible English captions; selectable English captions and downloads are also supplied. A genuine recorded frame is briefly held for explanation. Brief loading transitions remain when changing demand views. No source values or stored configuration were changed.

1. Confirm the scope

In Manager, open Readings, then History. Check Current Selection: the site and device record must match your operating question. The example uses SATEC → Demo Site → PM180 SATEC Income. A record name alone does not establish the physical equipment behind it.

2. Set a completed period

Read both date boundaries before applying them. The filmed example is 10 November 2026 00:00 to 11 November 2026 00:00, as displayed by XPW. This interface shows month first: 11/10/2026 means 10 November. Use Apply after confirming the range.

3. Choose the measure and unit

Under Data type, use Phase → Active Power. kW describes power at a reading; kWh describes accumulated energy. L1, L2 and L3 identify phases of the selected record.

4. Compare the traces

Click legend entries to hide a trace, then click them again to restore it. A hidden trace says nothing about whether a phase is electrically present. Read the time axis and the Summary together. The filmed L1 maximum is 37.54 kW for the selected History period; it is not automatically the billing maximum demand.

5. Inspect and reset the zoom

Hold the left mouse button inside the plot, drag across the time window and release. Confirm that the plotted hours narrow and Reset zoom appears. The reporting dates at the top stay unchanged. Click Reset zoom to return to the whole-day profile.

6. Read the timestamped row

Use the Details table and read across one timestamp. The filmed midnight L1 active-power entry is 10.31 kW. Check the units and actual timestamps: the example includes readings that do not fall exactly on quarter hours. A joined graph line does not prove complete interval data.

7. Read demand fields with their context

Use Power & Demand → Total Demands. Keep Power Demand separate from Max. Power Demand, and kW separate from kVA. Confirm demand interval, calculation method and reset history from the relevant meter configuration and documentation before relying on demand figures. These settings were not established by this lesson.

8. Keep the power-factor sign

Return to Phase → PF. Preserve the sign shown in the Details table. A minus sign alone does not establish reverse energy, a wiring error or a fault. Use the meter’s documented sign convention and supporting measurements.

Transcript and references

How much power was this meter recording, and when did it change? Expertpower's History view helps you answer that question without changing the meter.

This is the SATEC Demo Site, using the existing record called P M one eighty SATEC Income. We are demonstrating how to read the screen. The record name alone does not prove the equipment connected behind it.

From Manager, open Readings, then History. Check Current Selection before interpreting the graph. Confirm the site and the device, and keep that context visible as you work.

Choose a completed day. Here, the reporting range runs from midnight on the tenth of November to midnight on the eleventh. Read both boundaries, then apply the selection. Dates are shown month first in this interface.

Under Data type, choose Phase, then Active Power. The unit is kilowatts. Power describes the rate of energy use at a reading. Energy, measured in kilowatt hours, accumulates over time. A power reading and an energy total answer different questions.

The legend identifies phase one, phase two and phase three. These are phases of the selected record, not three separate sites. Clicking a legend entry hides that trace. Hide the other two to inspect phase one, then click them again to restore the comparison. A hidden trace is not evidence of a dead phase.

Look at the time axis and the Summary together. On this displayed day, phase one's maximum is thirty-seven point five four kilowatts. That is the maximum shown for this History selection. It does not automatically establish the maximum demand used for billing.

To inspect part of the profile, hold the left mouse button inside the plot, drag across the time window, then release. The plotted hours narrow and Reset zoom appears. The reporting dates at the top stay the same. Click Reset zoom to restore the whole day's context.

The Details table gives each reading its own timestamp. For example, the midnight row shows ten point three one kilowatts for phase one. Always read across the same row and check the units. Do not assume every timestamp is exactly on a quarter hour, or that a joined line proves complete data.

For demand fields, choose Power and Demand, then Total Demands. Read the full field name: Power Demand and Maximum Power Demand are separate entries. Kilowatts and kilovolt amperes are different units. Before using a demand figure for a decision, confirm the meter's demand interval, calculation method and reset history. Those settings have not been established by this demonstration.

Return to Phase and choose P F to inspect power factor. Preserve the displayed sign. A minus sign on its own is not a diagnosis of reverse energy, incorrect wiring or a fault. Check the meter's documented convention and supporting measurements before interpreting it.

Use the same sequence each time: check the selected record and period, choose the quantity and unit, inspect the graph, and confirm the timestamped details. You now have a precise observation to investigate, rather than a conclusion based on one line.

References

Download video · Download VTT captions · Download SRT captions