+61 2 4774-2959
[email protected]
  • About SATEC
  • Billing & Revenue Metering Catalogue
SATEC (Australia) Pty LtdSATEC (Australia) Pty LtdSATEC (Australia) Pty LtdSATEC (Australia) Pty Ltd
  • HARDWARE
    • All Metering Products
    • Current Transformers
    • DC Energy Metering
    • Expansion Modules
    • Frequency Control Ancillary Services – FCAS
    • Multi-Channel Energy Meters
    • NMI Approved Energy Meters
    • Phasor Measurement Unit
    • Power Quality Analysers
  • SOFTWARE
    • Expertpower SaaS – EMS, Billing, Power Quality
    • Meter Data Management (MDM)
    • Power Analysis Software (PAS)
  • SOLUTIONS
    • Automatic Demand Response
    • Disturbance Direction Detection
    • Frequency Control Ancillary Services (FCAS)
    • Large-Scale Generation Certificates (LGCs)
    • NMI Approved Retrofit Energy Metering
    • Phasor Measurement Unit
    • Power of Choice Metering
    • Time of Use (TOU) Control
  • NEWS
  • DOWNLOADS
    • Billing & Revenue Metering Catalogue
    • Current Product Catalogue
    • Manuals & Datasheets
    • Power Analysis Software (PAS)
  • CONTACT
    • About SATEC
NextPrevious
BFM2136 Multi Channel energy meter

Data Centre Power Metering for NABERS

By SATEC (Australia) Pty Ltd | Industry News | Comments are Closed | 12 January, 2015 | 1

NABERS rating for data centre power metering, load management and performance has been introduced to encourage improved environmental performance within the commercial built arena, improving innovation and outcomes for reducing energy consumption and reduced green-house gas (GHG) emissions. SATEC’s solution with the BFM136 for multiple circuit metering leads the market in performance metering.

The BFM136 can meter up to 36 single phase electrical loads, or 12 three phase loads or a combination of both using SATEC current sensors (HACS) in a compact Din Rail or Wall mounted design. Together with SATEC current transformers/HACS (current sensors) monitoring of loads can be as low as 50 milliamps up to 3000 Amps providing a metering solution unequal in low load monitoring performance. In addition, the BFM136 has been designed to withstand 12KV impulse testing as required by National Measurement Institute of Australia (NMI).

SATEC metering is used in many electrical metering applications, including industrial and commercial smart metering for energy profiling, load management and electricity billing solutions.

Find more about data centre power metering, visit our BFM136 Multi-Channel Energy Meter page. View the BFM136 Multi Channel Energy Meter Datasheet.

data centre load management, multi-circuit metering, NABERS, smart metering

NextPrevious

BOOK AN ONLINE MEETING


INDUSTRY NEWS & VIEWS

Get fortnightly updates delivered straight to your inbox.

Energy Management Knowledge Base

NEWS

  • Why Power Visibility Is the First Step to Unlocking Data Centre Stranded Capacity
  • How Incorrect Energy Readings Can Affect Tenant Billing and Cost Recovery
  • Power Quality Forensics: How PAS Helps Reconstruct What Happened Before an Electrical Event
  • Smart Energy Monitoring for Supermarkets: From Meter Data to Real Savings
  • The Role Of Power Quality In An Industrial Energy Monitoring System
SATEC Australia logo

SATEC – Solutions And Technology for Energy Control

SATEC’s presence in Australia brings together 40 plus years of experience and knowledge for Energy Management Solutions.

The culmination of local expertise and SATEC’s Global leadership in metering, power quality analysers and software provides a source of knowledge to satisfy customer’s ever changing demands for today’s Energy and Power Quality Applications.

Quick Find

  • Contact
  • Metering Products
  • Energy Management Software
  • News – Events – Updates
  • Downloads
  • Billing & Revenue Metering Catalogue
  • Current Product Catalogue
  • Energy Management Knowledge Base
  • Terms & Conditions
  • Privacy Policy
  • Privacy Policy – eXpertConnect

Recent Posts

  • Why Power Visibility Is the First Step to Unlocking Data Centre Stranded Capacity

    Why Power Visibility Is the First Step to Unlocking Data Centre Stranded Capacity

    Learn how power visibility helps reduce data centre stranded capacity and how SATEC metering solutions support smarter data centre energy decisions.

    24 June, 2026
  • How Incorrect Energy Readings Can Affect Tenant Billing and Cost Recovery

    How Incorrect Energy Readings Can Affect Tenant Billing and Cost Recovery

    Incorrect energy readings can distort tenant billing and cost recovery. Learn how accurate metering helps reduce disputes, recover costs and improve energy transparency.

    23 June, 2026
© 2025 SATEC (Australia) Pty Ltd. | ABN 21-142640417 | SATEC® All Rights Reserved
  • HARDWARE
    • All Metering Products
    • Current Transformers
    • DC Energy Metering
    • Expansion Modules
    • Frequency Control Ancillary Services – FCAS
    • Multi-Channel Energy Meters
    • NMI Approved Energy Meters
    • Phasor Measurement Unit
    • Power Quality Analysers
  • SOFTWARE
    • Expertpower SaaS – EMS, Billing, Power Quality
    • Meter Data Management (MDM)
    • Power Analysis Software (PAS)
  • SOLUTIONS
    • Automatic Demand Response
    • Disturbance Direction Detection
    • Frequency Control Ancillary Services (FCAS)
    • Large-Scale Generation Certificates (LGCs)
    • NMI Approved Retrofit Energy Metering
    • Phasor Measurement Unit
    • Power of Choice Metering
    • Time of Use (TOU) Control
  • NEWS
  • DOWNLOADS
    • Billing & Revenue Metering Catalogue
    • Current Product Catalogue
    • Manuals & Datasheets
    • Power Analysis Software (PAS)
  • CONTACT
    • About SATEC
SATEC (Australia) Pty Ltd