+61 2 4774-2959
[email protected]
  • About SATEC
  • Billing & Revenue Metering Catalogue
SATEC (Australia) Pty LtdSATEC (Australia) Pty LtdSATEC (Australia) Pty LtdSATEC (Australia) Pty Ltd
  • HARDWARE
    • All Metering Products
    • Current Transformers
    • DC Energy Metering
    • Expansion Modules
    • Frequency Control Ancillary Services – FCAS
    • Multi-Channel Energy Meters
    • NMI Approved Energy Meters
    • Phasor Measurement Unit
    • Power Quality Analysers
  • SOFTWARE
    • Expertpower SaaS – EMS, Billing, Power Quality
    • Meter Data Management (MDM)
    • Power Analysis Software (PAS)
  • SOLUTIONS
    • Automatic Demand Response
    • Disturbance Direction Detection
    • Frequency Control Ancillary Services (FCAS)
    • Large-Scale Generation Certificates (LGCs)
    • NMI Approved Retrofit Energy Metering
    • Phasor Measurement Unit
    • Power of Choice Metering
    • Time of Use (TOU) Control
  • NEWS
  • DOWNLOADS
    • Billing & Revenue Metering Catalogue
    • Current Product Catalogue
    • Manuals & Datasheets
    • Power Analysis Software (PAS)
  • CONTACT
    • About SATEC

Blog

NMI M6 Defence Metering in bases such the RAAF Base in Townsville

NMI M6 Defence Metering: Pattern Approved Solutions for Australian Military Facilities

By SATEC (Australia) Pty Ltd | AS 62052/62053 Safety & Accuracy, Featured, NMI Pattern Approval & NITP-14 | Comments are Closed | 24 September, 2025 | 0

Discover NMI M6-1 pattern approved electricity meters for Australian defence facilities. SATEC’s Class 0.5S accuracy meters ensure compliance with National Measurement Act requirements for military energy infrastructure.

Shadow metering (also known as check metering) in a high rise commercial building

Shadow Metering Solutions: Ensuring Fair Tenant Billing in Australia

By SATEC (Australia) Pty Ltd | Featured, Sub-Metering & Billing | Comments are Closed | 8 September, 2025 | 0

Discover how SATEC’s shadow metering solutions deliver transparent, compliant tenant utility billing for Australian commercial properties. Advanced power metering technology for fair billing practices.

Sustainable building in Sydney with NABERS rating

How NMI Approved Energy Meters Support NABERS Certification

By SATEC (Australia) Pty Ltd | Featured, Industry News | Comments are Closed | 13 February, 2025 | 1

For buildings aiming to achieve NABERS (National Australian Built Environment Rating System) certification, NMI (National Measurement Institute) approved energy meters play a vital role in ensuring precise and compliant energy data.

Segregated metering for Solar PV applications

First NMI Approved DIN Meter Used as Three (3) Single Phase Meters

By SATEC (Australia) Pty Ltd | Featured, Product News | Comments are Closed | 1 June, 2020 | 2

SATEC’s eXpertmeter EM133-XM-HACS is the 1st DIN meter approved by the National Measurement Institute (NMI) to be used for three (3) Single-Phase Smart-Meters in a single compact unit!

BFM2136 Multi Channel energy meter

Multi Circuit Meter BFM136 with 36 Electrical Circuits is now NMI Approved

By SATEC (Australia) Pty Ltd | Product News | Comments are Closed | 20 January, 2015 | 0

SATEC continue to set the standard in Energy Metering design with the release of the NMI Approved BFM136 Multi Circuit Meter, suitable for use on multiple electrical circuits.

EM133-XM Smart Energy Meter

NMI Compliant Energy Meters To Pass The 12KV Impulse Test

By SATEC (Australia) Pty Ltd | Industry News | Comments are Closed | 19 January, 2015 | 1

One of the many technical and metrology requirements for obtaining pattern approval and verification from The National Measurement Institute (NMI) for any active-energy electricity meter to be used for trade is for the energy meter to pass the 12KV impulse test.

EM133-XM Smart Energy Meter

Why do Smart Meters need a battery to keep the time?

By SATEC (Australia) Pty Ltd | Industry News, Product News | Comments are Closed | 12 January, 2015 | 1

Electricity meters, energy meters, multi-function metering and any power metering incorporating internal clocks for date/time stamp resolution must comply with NMI electrical metering standards to ensure the clock time does not drift.

BFM136 Branch Feeder Meter

Electricity Multi-Circuit Metering Technology Saves Space and Installation Time As Much As 75%

By SATEC (Australia) Pty Ltd | Popular Posts, Product News | Comments are Closed | 21 December, 2014 | 0

SATEC’s electricity multi circuit metering technology can reduce space and installation time by as much as 75% when the BFM136 is installed when compared to discrete metering installations.

BOOK AN ONLINE MEETING

INDUSTRY NEWS & VIEWS

Get fortnightly updates delivered straight to your inbox.

Energy Management Knowledge Base

NEWS

  • Energy Usage in Data Centres: What’s Driving It, How to Measure It and How to Control It
  • Poor Power Factor: What It Is, Why It Matters and How to Fix It
  • Energy Monitoring: Why It Matters More Than Ever (and How to Get It Right)
  • VPP Billing Software: Real-Time Tariff Integration for Australian Energy Retailers
  • 3 Phase Electricity Meter: What It Is, How It Works and When You Need One
SATEC Australia logo

SATEC – Solutions And Technology for Energy Control

SATEC’s presence in Australia brings together 40 plus years of experience and knowledge for Energy Management Solutions.

The culmination of local expertise and SATEC’s Global leadership in metering, power quality analysers and software provides a source of knowledge to satisfy customer’s ever changing demands for today’s Energy and Power Quality Applications.

Quick Find

  • Contact
  • Metering Products
  • Energy Management Software
  • News – Events – Updates
  • Downloads
  • Billing & Revenue Metering Catalogue
  • Current Product Catalogue
  • Energy Management Knowledge Base
  • Terms & Conditions
  • Privacy Policy

Recent Posts

  • Energy Usage in Data Centres

    Energy Usage in Data Centres: What’s Driving It, How to Measure It and How to Control It

    Energy usage in data centres is rising fast. Learn the key drivers, metrics like PUE and practical ways to measure and reduce power with SATEC metering.

    20 January, 2026
  • Industrial facilities suffer from Poor Power Factor without power quality monitoring

    Poor Power Factor: What It Is, Why It Matters and How to Fix It

    Power factor affects efficiency, demand and equipment health. Learn what causes poor power factor, how it impacts your site and how to fix it with metering-led correction.

    19 January, 2026
© 2025 SATEC (Australia) Pty Ltd. | ABN 21-142640417 | SATEC® All Rights Reserved
  • HARDWARE
    • All Metering Products
    • Current Transformers
    • DC Energy Metering
    • Expansion Modules
    • Frequency Control Ancillary Services – FCAS
    • Multi-Channel Energy Meters
    • NMI Approved Energy Meters
    • Phasor Measurement Unit
    • Power Quality Analysers
  • SOFTWARE
    • Expertpower SaaS – EMS, Billing, Power Quality
    • Meter Data Management (MDM)
    • Power Analysis Software (PAS)
  • SOLUTIONS
    • Automatic Demand Response
    • Disturbance Direction Detection
    • Frequency Control Ancillary Services (FCAS)
    • Large-Scale Generation Certificates (LGCs)
    • NMI Approved Retrofit Energy Metering
    • Phasor Measurement Unit
    • Power of Choice Metering
    • Time of Use (TOU) Control
  • NEWS
  • DOWNLOADS
    • Billing & Revenue Metering Catalogue
    • Current Product Catalogue
    • Manuals & Datasheets
    • Power Analysis Software (PAS)
  • CONTACT
    • About SATEC
SATEC (Australia) Pty Ltd