About this recording

EM235 New local file, Internet connection at 192.168.1.203, two firmware read requests and online Properties.

Screen recording of this EM235 demonstration. Follow the steps below using your own meter details.

Chapters

Create a blank local site, check that the meter replies, then read its details in Properties. The walkthrough uses an EM235; choose the correct model and connection for your own meter.

EM235 walkthrough with written steps below.

Before you start

Have the meter details ready

Use the model, network address and Modbus address assigned to your meter. In this demonstration the EM235 uses IP address 192.168.1.203, device address 1 and host port 502. These are this demonstration’s settings.

If you are checking the PC network first, open Command Prompt and run ipconfig. Then use ping with the meter’s IP address. A reply shows that the address is reachable; it does not identify the meter or prove that Modbus communication works.

Source 2 · Source 5

Create the blank Site Config file

  1. Open the site list

    Select Tools > Configuration > Sites. Choose the folder for the new local database.

    Source 1 · Source 5

  2. Create the file

    Enter a short name, such as EM235 New, and select New. Select the new file and confirm OK. Keep existing site files intact.

    Source 1 · Source 5

  3. Choose the meter

    Select EM235 and Internet Site, then enter device address 1 for this demonstration. Use the model and address assigned to your own meter.

    Source 1 · Source 5

  4. Set the connection

    On Connection, enter 192.168.1.203, host port 502 and Modbus RTU/TCP for this demonstration. Confirm OK. Port 502 is the usual direct Modbus TCP port; use a different port only when your network setup requires it. These fields tell PAS where to connect; they do not upload the meter’s settings.

    Source 2 · Source 5

Source 1 · Source 2 · Source 5

Test communication before reading measurements

  1. Open Communication Test

    Leave Monitor > On line switched off. In this PAS demonstration, Communication Test is available in that state. Select Monitor > Communication Test.

    Source 5

  2. Prepare a read request

    Select Edit Request. For this EM235, use device address 1, function 03 (read holding registers), raw Start Register 46100 and Word Count 2. Start Register is where PAS starts reading. Word Count 2 requests two register values. Confirm the request. Use the applicable meter’s register map when working with a different model.

    Source 4 · Source 5

  3. Send and repeat

    Select Send, then send the same request again. The demonstration returns 4005 and 9 on both reads. The final counters show OK 2, with N/R, NAK and Check Error all at zero. Check the counters and returned words on your own test.

    Source 5

  4. Understand the result

    Firmware is the software inside the meter. This test reads the firmware version and build fields. The same values should return on each read unless the firmware changes. Use Properties next to check the meter’s identity.

    Source 4 · Source 5

Source 4 · Source 5

Read the meter details in Properties

  1. Go online

    Close Communication Test. Check that the new site is selected, then select Monitor > On line.

    Source 5

  2. Open Properties

    Right-click the selected site and choose Properties. Read the reported model, online status, serial number and firmware. Scroll through the available information.

    Source 5

  3. Match the intended meter

    Compare the serial number in Properties with the meter’s label or your installation record.

    Source 5

Source 5

Next: upload a configuration backup

A new site is not yet a backup. Next, follow Upload the setups, then duplicate the backup to save the meter’s current settings and make a working copy.

Source 3 · Source 5

Pro Tips after the menu workflow

If OK is outside the visible area, check the active dialog and focused control, then press Enter to activate its default action. Read any confirmation that follows.

Keep site names short. Expand the + beside a site to see its programming menus, and widen the Site Tree enough to read their full names.

Use the menu workflow first. Practise keyboard shortcuts after you know which dialog and setting you need. You can pause or rewind the video whenever you want.

Source 1 · Source 5

Limits and checks

Check your understanding

Does a successful firmware read identify the physical meter?

Show answer

No. It shows that a device answered the request. Read its serial number in online Properties and compare it with the intended meter or installation record.

Source 4 · Source 5

Is a newly created blank site already a backup?

Show answer

No. Upload the meter’s current setups into the intended local file and check the result first.

Source 1 · Source 3

Sources

Revision and review details
RevisionChange and reasonReview / supersedes
20261108-site-files-v1
8 November 2026
Added the new-site, setup-backup, Duplicate and online/offline workflow.

Teach the meter and its local Site Config file as separate stores.

Written draft; complete CT comparison recording pending.

Initial site-file course.

20261108-em235-new-site-v1
8 November 2026
Added the EM235 blank-site, read-only communication and Properties workflow.

Show the complete first connection before the backup lesson.

Companion instructions for the reviewed EM235 walkthrough.

General create-and-identify instructions; other lessons unchanged.