+61 2 4774-2959
[email protected]
  • About SATEC
  • Billing & Revenue Metering Catalogue
SATEC (Australia) Pty LtdSATEC (Australia) Pty LtdSATEC (Australia) Pty LtdSATEC (Australia) Pty Ltd
  • HARDWARE
    • All Metering Products
    • Current Transformers
    • DC Energy Metering
    • Expansion Modules
    • Frequency Control Ancillary Services – FCAS
    • Multi-Channel Energy Meters
    • NMI Approved Energy Meters
    • Phasor Measurement Unit
    • Power Quality Analysers
  • SOFTWARE
    • Expertpower SaaS – EMS, Billing, Power Quality
    • Meter Data Management (MDM)
    • Power Analysis Software (PAS)
  • SOLUTIONS
    • Automatic Demand Response
    • Disturbance Direction Detection
    • Frequency Control Ancillary Services (FCAS)
    • Large-Scale Generation Certificates (LGCs)
    • NMI Approved Retrofit Energy Metering
    • Phasor Measurement Unit
    • Power of Choice Metering
    • Time of Use (TOU) Control
  • NEWS
  • DOWNLOADS
    • Billing & Revenue Metering Catalogue
    • Current Product Catalogue
    • Manuals & Datasheets
    • Power Analysis Software (PAS)
  • CONTACT
    • About SATEC
NextPrevious
Energy Measurement For Retrofit Projects on an old building in Sydney

Energy Measurement For Retrofit Projects: How To Add Meters When Space Is Tight

By SATEC (Australia) Pty Ltd | Commercial & Mixed-Use, Councils & Public Facilities, Featured, Future-Proofing & Upgrades, Power Quality, Retrofit Metering, Smart Energy Meters, Sub-Metering & Billing | 0 comment | 6 January, 2026 | 0

Retrofitting an existing building is rather like renovating an old house. You never quite know what you’re going to find behind the walls. Drawings don’t match reality, switchboards are already crowded and any downtime has to be carefully managed. Yet this is exactly where energy measurement delivers exceptional value.

When you can see how, when and where electricity is being used, you can reduce waste, control demand peaks, verify upgrade performance and allocate costs fairly. The challenge is practical. How do you add meters when the space you wish you had simply doesn’t exist?

Why Energy Measurement Is Harder In Retrofit Environments

New builds can plan for metering from day one. They get neat DIN rails, clear segregation and communications infrastructure designed for monitoring. Retrofits rarely have that luxury.

Common constraints include limited panel space (no spare DIN rail, shallow enclosures or crowded cable ways), legacy switchboards with unknown modifications over the years and short outage windows that make rework difficult. Mixed loads aren’t cleanly separated. HVAC, lighting, tenancy and plant equipment often share the same crowded boards. Documentation is inconsistent and access to risers or distribution points is limited.

Despite all that, energy measurement is often most valuable in these sites. Retrofits are typically driven by cost, compliance, reliability or sustainability outcomes. All of those benefit from better visibility.

Start With The "Why": Define What You Must Measure

When space is tight, you can’t meter everything at once. The fastest path to a good retrofit outcome is to define the purpose of the metering before specifying hardware. Ask yourself what decisions the data will enable. Are you focused on demand reduction? Tenant billing? Fault detection? Verifying upgrade savings?

Think about what level of granularity is required. Do you need whole building measurement, main incomer plus major plant or circuit-level detail? Consider what time resolution matters. You might need 15-minute intervals for demand and billing or higher resolution for diagnostics and power quality.

From there, you can prioritise measurement points. In many retrofits, a tiered approach works well. Start with the main incomer and the biggest loads: chillers, air handling units, lifts, electric vehicle charging and major distribution boards. Then expand only where the data reveals a clear business case.

Pick The Right Metering Architecture For Tight Spaces

Space constraints usually force a choice. You can either do it all in one device or distribute the measurement across smaller components. In retrofits, the winning approach is often whichever reduces physical footprint and installation time.

Compact Meters And Multi-Circuit Metering

If your goal is to capture multiple downstream circuits, consider multi-circuit solutions that reduce the number of separate devices you need. Fewer devices can mean fewer terminations, less wiring congestion and less time spent trying to make everything fit.

CT-Based Measurement To Avoid Heavy Rewiring

In cramped boards, the biggest pain is often the cabling, not the meter itself. Current transformers (CTs) can be a retrofit-friendly option because they allow you to measure current without rerouting existing conductors.

Split-core CTs can be particularly useful where disconnecting conductors is difficult. However, you should weigh accuracy needs and site requirements carefully.

Remote Metering Components (Where Appropriate)

Sometimes the right place for a meter isn’t inside the original switchboard at all. Depending on site layout, you may be able to install metering in an adjacent enclosure, a dedicated metering panel or another accessible distribution point.

This can be a clean way to keep the legacy board untouched whilst still capturing the data you need.

The goal is to respect the reality of the site. You want minimal disruption, minimal new cabling and maximum usable data.

Make Room Without Making A Mess: Practical Space Strategies

Even in packed boards, there are often a few options that don’t require a full rebuild. Use a targeted metering scope first. If you’re squeezing a device into a board with no spare capacity, the best space-saving tool is restraint. Meter the incomer and the top three to five loads first.

You’ll often capture the majority of actionable energy and demand drivers with a small number of points.

Choose mounting and form factor carefully. DIN-rail meters are common, but in shallow enclosures you may need lower-profile options or different mounting arrangements.

A quick physical survey can prevent nasty surprises on install day. Measure depth, available rail length and cable duct clearance early.

Plan CT placement like a cable management project. CTs don’t take much space individually but multiple CTs plus secondary wiring can create congestion. Plan the CT routing, labelling and separation early.

It’s much easier to install cleanly when you’ve mapped it, rather than improvising inside a live work zone.

Don’t overlook communications. Energy measurement is only as useful as the data you can reliably collect. In retrofits, communications is often the hidden constraint. There might be no Ethernet, limited pathways or interference-prone environments.

Decide early whether you’ll use RS-485 daisy chaining, Ethernet where available or a gateway approach that reduces cabling runs.

Accuracy, Safety And Compliance: Non-Negotiables

Retrofits can tempt teams to “just get something in”, but energy measurement data is only valuable if stakeholders trust it.

Accuracy matters. Ensure the meter class and CT selection match the purpose. Tenant billing needs higher confidence than general monitoring.

Installation quality counts. Poor CT orientation, incorrect ratios or voltage reference errors can quietly corrupt data.

Safety is paramount. Working in existing boards can involve brittle insulation, unlabelled modifications and limited working space. Ensure the installation approach matches site risk assessments and local electrical requirements.

Commissioning validates everything. Validate readings against known loads or utility data. A quick commissioning check can save months of doubt later.

When space is tight, mistakes are easier to make. The commissioning step is where you lock in trust.

Future-Proof Your Retrofit Metering

One of the most frustrating retrofit outcomes is installing meters that work today but become a dead end tomorrow. Future-proofing doesn’t have to mean overbuilding. It means leaving yourself options. Think about scalable communications. Can you add more meters later without redesigning the network? Consider data usability. Can the system deliver the reports or dashboards you’ll need to justify upgrades?

Don’t forget power quality visibility. In many commercial and industrial sites, energy cost isn’t the whole story. Power quality issues can damage equipment, cause nuisance trips and distort measurements. If you can’t fit everything now, design the system so phase two is straightforward.

How SATEC Supports Energy Measurement In Retrofit Projects

Retrofit projects are where SATEC’s approach to metering really shines. High capability, practical installation and strong performance in constrained environments. SATEC provides compact metering solutions designed for accurate energy measurement. Options suit both straightforward monitoring and more advanced use cases.

For sites where you need deeper insight than a basic meter read, SATEC meters can also support power quality monitoring. This helps you identify issues like harmonics or disturbances that can affect equipment performance and, in some situations, the quality of your measurement data.

If your retrofit is space-constrained, SATEC’s portfolio is well suited to delivering reliable energy measurement without demanding a switchboard rebuild. Since retrofit upgrades often evolve over time, SATEC solutions can support a staged rollout. Start with your highest-value measurement points and expand as the business case proves itself.

In short: if you need an energy metering solution that fits the realities of retrofit environments, SATEC is built for that job.

A Simple Retrofit Roadmap That Works

Energy measurement in retrofit projects is never “one size fits all” but the pathway to success is surprisingly consistent.

  • Define the decisions the data must support.
  • Prioritise measurement points with the biggest impact.
  • Choose a compact, retrofit-friendly metering architecture.
  • Plan CTs, mounting and communications with space constraints in mind.
  • Commission carefully so stakeholders trust the data.
  • Design for expansion, not perfection on day one.

When space is tight, the smartest retrofit metering isn’t the one that measures everything. It’s the one that measures the right things accurately, reliably and in a way you can build on.

Talk to our team about your retrofit project today.

FAQs - Energy Measurement For Retrofit Projects

Why is energy measurement harder in retrofit projects?

Retrofit switchboards are often crowded, undocumented and have limited outage windows, which makes adding meters and communications more complex.

What should we measure first if we can’t meter everything?

Start with the main incomer and the biggest loads (like HVAC, lifts, EV chargers and major distribution boards) to get the most actionable energy measurement data quickly.

Can we add energy measurement without rewiring the whole board?

Yes. CT-based energy metering often lets you capture accurate current data with minimal disruption, especially when paired with a retrofit-friendly communications setup.

How do SATEC meters help in space-constrained retrofits?

SATEC offers compact meters suited to tight switchboards, with options that support reliable energy measurement and power quality monitoring for deeper visibility.

commercial energy retrofitting, energy measurement, retro-fit electrical metering, retrofit electricity metering, retrofit energy metering, retrofit power meters

NextPrevious

BOOK AN ONLINE MEETING

INDUSTRY NEWS & VIEWS

Get fortnightly updates delivered straight to your inbox.

Energy Management Knowledge Base

NEWS

  • Power Metering for Holiday Parks: Smarter Energy, Happier Guests, Better Margins
  • Energy Measurement For Retrofit Projects: How To Add Meters When Space Is Tight
  • Small-scale Technology Certificates (STCs): How They Work and Why Smart Metering Matters
  • Electricity Management Software for Airports: Turning Complexity Into Control
  • Optimising Smart Metering Software: How to Get More Value From Every kWh
SATEC Australia logo

SATEC – Solutions And Technology for Energy Control

SATEC’s presence in Australia brings together 40 plus years of experience and knowledge for Energy Management Solutions.

The culmination of local expertise and SATEC’s Global leadership in metering, power quality analysers and software provides a source of knowledge to satisfy customer’s ever changing demands for today’s Energy and Power Quality Applications.

Quick Find

  • Contact
  • Metering Products
  • Energy Management Software
  • News – Events – Updates
  • Downloads
  • Billing & Revenue Metering Catalogue
  • Current Product Catalogue
  • Energy Management Knowledge Base
  • Terms & Conditions
  • Privacy Policy

Recent Posts

  • Power Metering for Holiday Parks

    Power Metering for Holiday Parks: Smarter Energy, Happier Guests, Better Margins

    Power metering for holiday parks helps recover costs fairly, reduce disputes and improve energy visibility. Learn what to look for and how SATEC provides the metering solution.

    7 January, 2026
  • Energy Measurement For Retrofit Projects on an old building in Sydney

    Energy Measurement For Retrofit Projects: How To Add Meters When Space Is Tight

    Energy measurement in retrofit projects can be tricky when switchboards are cramped. Learn practical ways to add meters, ensure accuracy and future-proof sites.

    6 January, 2026
© 2025 SATEC (Australia) Pty Ltd. | ABN 21-142640417 | SATEC® All Rights Reserved
  • HARDWARE
    • All Metering Products
    • Current Transformers
    • DC Energy Metering
    • Expansion Modules
    • Frequency Control Ancillary Services – FCAS
    • Multi-Channel Energy Meters
    • NMI Approved Energy Meters
    • Phasor Measurement Unit
    • Power Quality Analysers
  • SOFTWARE
    • Expertpower SaaS – EMS, Billing, Power Quality
    • Meter Data Management (MDM)
    • Power Analysis Software (PAS)
  • SOLUTIONS
    • Automatic Demand Response
    • Disturbance Direction Detection
    • Frequency Control Ancillary Services (FCAS)
    • Large-Scale Generation Certificates (LGCs)
    • NMI Approved Retrofit Energy Metering
    • Phasor Measurement Unit
    • Power of Choice Metering
    • Time of Use (TOU) Control
  • NEWS
  • DOWNLOADS
    • Billing & Revenue Metering Catalogue
    • Current Product Catalogue
    • Manuals & Datasheets
    • Power Analysis Software (PAS)
  • CONTACT
    • About SATEC
SATEC (Australia) Pty Ltd