PM130 PLUS · QUICK START GUIDE

PM130 PLUS quick start guide

PM130 PLUS Quick Start Manual

Transcribed from the SATEC document PM130 PLUS Quick Start Manual, BG0441 REV.A11, date not printed (PDF, 4 pages, 1028 KB). Drawings and diagrams are in the PDF. If this page and the PDF differ, the PDF is right; tell us through the contact form.

PM130 PLUS Quick Start Manual

This Quick Start Manual is a short guide on how to mount, connect, configure and operate the PM130 PLUS. It is not intended to replace reading the full User Manual – and particularly the safety precautions. The manual is available on the Product Documentation CD.

WarningMounting, electrical connection and settings of the PM130 shall be made in accordance with all applicable laws and/or regulations and be performed by authorized personnel only.

Mounting

Position the PM130 meter in 92×92mm square or 4” round cutout (Figure 1). If two PM130 are positioned side by side, keep at least 150mm (5.9”) between their centers to allow installation of add-on modules (140mm/5.5” if only small form modules will be used).

Attach the PM130 unit using washers and nuts. Make sure that the unit is securely attached into the wall or cabinet fixture.

Figure 1: Panel mounting drawing, DIN43700 92x92mm or standard 4" round cut-out, with flat washer, lock washer and hex nut. Drawing not reproduced on this page. See page 1 of the PDF.

Connection

To connect follow these steps (Figure 2 shows a 4W LV installation with conventional CTs):

  1. Ensure that all incoming power sources are OFF.
  2. Check that you have the appropriate power supply.
  3. Connect the Power Supply inputs using 1.5 mm²/14AWG dedicated wires and breaker.
  4. Connect to the external CTs by passing the external CTs wires through the meter CT cores. Observe the arrow that indicates the current direction (Figure 2A). For HACS: connect the red or white wire to the “-” and orange or black wire to the “+“ terminal.
  5. In case of a retrofit application where each external CT ends with two wires (Note 2B): 5.1. Pass one wire through the meter CT core. 5.2. Connect the wire to one of the meter “optional CT wire termination” screws. 5.3. Connect the second wire from the external CT to the termination screw.
  6. Connect the measured voltage inputs
  7. Connect COM1 – RS-485 communication port
  8. To connect the optional module: 8.1. Make sure that the power is turned off 8.2. Remove the module cover 8.3. Attach the module and fasten the screws 8.4. Connect the module I/O or communication (see Figure 2C for DI/O wiring)
  9. Turn the power up
  10. Make sure the diagnostic led is off

Figure 2: 4W LV installation with conventional CTs; Figure 2A: CT markings; Figure 2C: DI/O wiring. Drawing not reproduced on this page. See page 2 of the PDF.

The “optional CT wire termination” allows connection of the two wires from the CTs. They have no internal connection and their use is optional.

Operation

The PM130 PLUS is operated using the front panel which consists of a 3-line 7-segment display, up to 33 LEDs (depending on model) and six keys as shown below:

Front panel of the PM130EH PLUS with labelled displays, LEDs and keys. Drawing not reproduced on this page. See page 3 of the PDF.

There are two display modes: readings and menus.

Readings Mode

There are four groups of readings: Common measurement, Min/Max, Harmonics and Energy. Use MAX/MIN or HIIIIII or ENERGY to switch between groups, ▲ or ▼ to scroll within the group, or simultaneous ▲ and ▼ to go to the first screen of the current display group.

Menu Mode

Press SELECT to enter menu mode (blinking line indicates the selection). SELECT to change the selection, ENTER to drill down or ESC to go up. In editing mode use ▲ or ▼ to change the value (a number or submenu), ENTER to accept it, or ESC to cancel.

The following chart shows the structure of the menus:

StA (Status) Status Indications
DisplayMeaning
chs rotPhase rotation
To be confirmedVoltage angles
To be confirmedCurrent angles
rELRelay status (*D)
St.InDI status (*D)
CntCounter value in 0.1 hours
AlAr SP.Alarm setpoint
DiAGDiagnostics
SEr.nSerial number
SoftFirmware version
rssiGPRS status (*G)
OPS (Options) Read-only display of the configuration
DisplayMeaning
rtcReal Time Clock
bAscBasic configuration
Prt.1COM2 setup
Prt.2COM2 setup (*E/G/R/P)
rElRelay Output (*D)
AoUtAnalog Output (*A)
nEtNetwork configuration (*E)
SEtPSetpoints
dispDisplay
OptsOptions
CHG (Change) Configuration
DisplayMeaning
rStReset min/max, demands, etc.
Same as OPS (Options) menu
Option availability depends on installed add-in module: *D – Digital I/O; *A – Analog Output; *E – Ethernet; *G – GPRS; *R – RS232/422/485; *P – Profibus.

Configuration

The essential configuration includes:

  1. Basic measurement setup
  2. Communication setup and testing
  3. Resetting the min/max, energy, demands etc.

Additional recommended configuration: set points, TOU and data logging

It may be easier first to configure communication and use PAS software for setup

Basic Measurement Setup

In any display screen, press SELECT x 3 (until CHG blinks), then press ENTER (rSt blinks), then ▲ x 2 (bAsc) and ENTER to enter the Basic Settings Display.

Basic settings
ParameterDescriptionDefault
ConF (see below)Network wiring configuration4Ln3
PtTransformation ratio of the Potential Transformers1
Pt.FAdditional PT factor for EHV networkH1
CtThe Primary Rating Of The Current Transformers (quick access to this parameter: press SELECT, then simultaneous ▲ and SELECT)5A
d.P (E & EH models)Duration in minutes of the power demand period calculations E = External pulse in DI115
nd.P (E & EH models)The number of blocks to be averaged for sliding window demands1
Ad.PDuration in seconds for voltage and current demand900
FrEqThe nominal frequency60 Hz
LoAdMax. Demand Load Current in Amperes. 0 = CT primary current.0
Wiring modes
Wiring ModeSetup
3-wire 2-element Delta direct connection using 2 CTs3dIr2
4-wire 3-element Wye direct connection or 3PTs, and 3 CTs4Ln3 or 4LL3*
3-wire 2-element Open Delta connection using 2 PTs, 2 CTs30P2
4-wire 2½-element Wye connection using 2 PTs, 3 CTs3Ln3 or 3LL3*
3-wire 2½-element Open Delta connection using 2 PTs, 3 CTs30P3
4-wire 3-element Delta direct connection using 3 CTs4Ln3 or 4LL3*
3-wire 2½-element Broken Delta connection using 2 PTs, 3 CTs3bLn3 or 3bLL3*
* LN or LL denotes the default use of L-L or L-N voltages (in thresholds, min/max, demands etc.)

Communication setup and testing

In any display screen, press SELECT x 3 CHG blinks), then press ENTER (rSt blinks), then ▲ x 3 (Prt.1) and ENTER to setup the built in RS-485 port (COM1). If communication module is present, configure also COM2.

Resetting the min/max, energy, demands etc.

In any display screen, press SELECT x 3 (CHG blinks), then press ENTER (rSt blinks), then ENTER to enter the reset menu. Select the value to be reset, press SELECT to select, then press ENTER for 5 seconds until the QUERY notification is changed to donE.

Downloads and related

Questions about this document? Use the contact form.