PM130 PLUS · WIRING DIAGRAM

Which PM130 PLUS wiring diagram applies to my installation?

PM130 PLUS with the TOU add-on module, from its manufacturer manual
PM130 PLUS and TOU add-on module, manufacturer manual page 42. Identification illustration only.

Quick answer

Table 2 of the manual lists each wiring configuration with its drawing and the wiring mode to set in the meter. The manual's general drawings show the meter's internal CT inputs, and HACS sensors have their own connection drawing. SATEC Australia's advice: check your meter's current input first, then match three things to a row of Table 2: the system (3-wire or 4-wire, Wye or Delta), whether the voltages are connected directly or through PTs, and how many CTs are used. Use this page to choose the drawing, then follow the drawing and the manual's installation instructions.

Before you start

  • The manual says only qualified personnel familiar with the instrument and its associated electrical equipment must perform setup procedures, and that all incoming AC power and other power sources must be turned off before performing any work on the instrument.
  • Before connecting the meter to the power source, the manual says to check the labels at the back of the instrument to ensure it is equipped with the appropriate power supply voltages, input voltages and currents.
  • SATEC Australia's advice: know your meter's current input (5 A, 1 A, HACS or RS5) before you choose a drawing. See Which PM130 PLUS model and current input do I have?.

Choose the drawing

Wiring configurationSetup codeFigurePage
3-wire, 2-element Delta, direct connection, 2 CTs3dir22-928
4-wire, 3-element Wye, direct connection, 3 CTs4Ln3 or 4LL32-1029
4-wire, 3-element Wye, 3 PTs, 3 CTs4Ln3 or 4LL32-1129
3-wire, 2-element Open Delta, 2 PTs, 2 CTs3OP22-1230
4-wire, 2½-element Wye, 2 PTs, 3 CTs3Ln3 or 3LL32-1330
3-wire, 2½-element Open Delta, 2 PTs, 3 CTs3OP32-1431
4-wire, 3-element Delta, direct connection, 3 CTs4Ln3 or 4LL32-1531
3-wire, 2½-element Broken Delta, 2 PTs, 3 CTs3bLn3 or 3bLL32-1632
3-wire or 4-wire, current from one phase (1 CT) and the line-to-line voltage from the other two phases2LL117 (direct), 18 (with PT)32–33
3-wire or 4-wire, current from one phase (1 CT) and the V23 voltage, with V1 connected to neutral1LL319 (direct), 20 (with PT)33–34

Where a row offers two codes, the LN code (such as 4Ln3) makes the meter report line-to-neutral voltages for minimum and maximum volts, volt demands and voltage harmonics. The LL code reports line-to-line voltages. The manual says the 3OP2 Open Delta connection gives accurate power measurements only when the voltages are balanced.

Set the wiring mode to match

Set the wiring mode in the meter's basic setup: the baSc menu on the front display, or General Setup in PAS. The default is 4Ln3. The manual says to set the wiring mode and transformer ratings before you set up setpoints and analogue outputs.

What the manual leaves unclear

  • Figure numbers. The voltage input section refers to Figures 2-8 to 2-15 for 690 V inputs and Figures 2-7 to 2-10 for 120 V inputs. Those numbers don't match Table 2, and Figure 2-8 is the current input connection drawing. The figure captions name the wiring mode on each drawing. SATEC Australia's advice: choose the drawing from Table 2 and the figure captions, not from the figure numbers in the voltage input section.
  • 1LL3. Table 2's description of the 1LL3 row is wrong: it repeats the 2LL1 wording. The 1LL3 drawings, Figures 19 and 20, use the current from one phase and the V23 voltage with V1 connected to neutral. Table 2 has drawings for 1LL3, but the wiring mode list in the setup chapter doesn't include it. SATEC Australia's advice: check with SATEC Australia before you design for 1LL3.
  • 120 V inputs. The manual mentions 120 V inputs as Option U for use with PTs. Neither the SATEC Ltd datasheet (July 2024) nor the SATEC Australia datasheet (TBV1.0) lists an Option U code. SATEC Australia's advice: check with SATEC Australia if you have, or need, 120 V inputs.
  • HACS and RS5. The manual's drawings show the meter's internal CT inputs, where each CT wire passes through the meter's CT core. A HACS meter has current terminals instead, and the HACS datasheet has its own PM13x HACS connection drawing. The manual doesn't say which drawings apply to RS5 inputs. SATEC Australia's advice: for HACS or RS5 meters, contact SATEC Australia to confirm the drawing before installation.

If you need help

Contact SATEC Australia technical support through our contact form. SATEC Australia's advice: include the meter's ordering code, the current input or sensor type, the system type and the number of PTs and CTs.

Manuals and source pages

  • PM130 PLUS Powermeter Series PM130P/PM130E/PM130EH Installation and Operation Manual, BG0425 Rev. A22:
    • Safety warning, page 3.
    • Voltage input connection, page 26. Current input connection, page 27.
    • Wiring diagrams, Table 2 and Figures 2-9 to 20, pages 28–34.
    • Basic meter setup, pages 86–87. Wiring modes, Table 21, page 88.
    • Printed and PDF page numbers are the same in this manual.
  • HACS High Accuracy Current Sensors datasheet (SATEC Ltd, May 2023), PM13x series HACS connection diagram, page 2.
  • Available from the SATEC Australia manuals and datasheets page. Evidence checked 22 November 2026.

Source review: 22 November 2026.

Contact SATEC technical support

Back to Knowledge Base home