What an EM720 can do depends on its model, its ordering options, the modules fitted in its expansion slots, its firmware and, for IEC 61850, a licence. A datasheet describes the whole family, not the meter in front of you. This page sets out what to record before commissioning, where the manufacturer's documents say to find it, and where those documents disagree.
The model: EM720 or EM720T
This page applies to the EM720 and EM720T. The ordering documents list two models: the EM720 basic model and the EM720T "Transient Power Master". The operation manual says the high-voltage fast transient recorder is provided with EM720T meters. It also describes a basic transient recorder provided with the EM720, which records transient voltages between phase conductors and the neutral terminal, or between two phase conductors, depending on the wiring configuration. SATEC Australia's advice: if you need fast transient recording, confirm the meter is an EM720T before you plan around it.
The installation manual also names a third model, the EM720U, described as an IEEE 1159 power quality model. No ordering document available to SATEC Australia lists an EM720U. SATEC Australia's advice: if your nameplate shows a model other than EM720 or EM720T, contact SATEC Australia before commissioning.
Read the nameplate
The operation manual's nameplate drawing shows the model ("Type"), the voltage input, the rated current, the watt-hour meter constant, the MAC address and the meter serial number. SATEC Australia's advice: photograph the whole nameplate before installation and keep the photograph with the site records.
The manuals do not agree on where the labels are. The installation manual says to check the labels on the front of the instrument; the operation manual says the labels on the back. SATEC Australia's advice: check both.
Decode the ordering code
SATEC Australia's advice: take the ordering code from the purchase order, quotation or delivery paperwork. Its fixed fields are:
| Field | Options |
|---|---|
| Model | EM720 or EM720T |
| Voltage inputs | 480V (480 V AC line to line) or 120V (120 V AC line to line) |
| Calibration frequency | 50HZ or 60HZ |
| Current inputs | 5 (5 A) or 1 (1 A) |
| Rechargeable battery | without, or B (with battery) |
The voltage option also sets the meter's power supply range, because the meter is powered from its measured voltage inputs. The installation manual gives 96–575 V AC for the 480V option and 45–250 V AC for the 120V option. An auxiliary power supply module can be fitted as well.
The rechargeable battery is covered in The two batteries in the EM720.
Module codes: two schemes
The manufacturer's documents use two different sets of module codes:
| Document | Communication module codes | Limit stated |
|---|---|---|
| EM720 datasheet, and SATEC Australia's current EM720 datasheet | COM-ETH, COM-IEC (Ethernet with IEC 61850 support), COM-UPG; the earlier datasheet also lists COM-GSM | "Maximum 2 modules per device" |
| EM720 brochure | IRIG, IRIG-ETH, IRIG-ETH-850, ETH, ETH-850, GSM | "Maximum 3 cards per device" |
The limits cover all the optional modules in each list, not only communication modules. The datasheets allow at most one Ethernet module, two I/O modules and one auxiliary power supply module within the two; the earlier datasheet also allows at most one GSM module. The brochure allows one of its communication card options, one GSM module, two I/O modules and one auxiliary power supply module within the three.
The datasheet also lists an expanded 16 MB memory option, XM. The installation manual describes "three slots for hot swap field installable option modules". No document says which scheme is current. SATEC Australia's advice: record the code exactly as written on your paperwork.
Record the fitted modules by slot
SATEC Australia's advice: look at the modules in the expansion slots and record what is in slots 1, 2 and 3. The documents give these placement rules:
- The GSM/GPRS modem goes in slot 3 only.
- USB is available in slots 1 and 2.
- For Ethernet, the installation manual says in one place that the Ethernet/USB module can only go in slots 1 and 2, and in another that Ethernet is available in any slot.
- If more than one module with a serial port is fitted, the operation manual says only the port in the left-hand slot is enabled.
Read the Device Info display
The Device Info display is one of the front-panel data displays described in Chapter 3 of the operation manual. It shows the serial number, production date and calibration date; the host processor, fast transient coprocessor and boot loader firmware versions; program and data flash memory sizes; serial port settings; the Ethernet MAC address and IP address; battery status; and operation time counters.
The operation manual says: "Always clear the meter operation time and fault counters before putting the meter into operation." SATEC Australia's advice: record the Device Info values and any diagnostic messages first, so the as-delivered state is kept.
Check the IEC 61850 licence
The IEC 61850 guide (BG0459 Rev. A4, section 6.1) says: "A valid license key must be provided in the EM720 for IEC 61850 communications. The device is normally shipped with a temporary license, which is valid for a 30-day operation and then can be extended for an additional month. A permanent license can be obtained from your local distributor for an additional fee. A device serial number must be provided in the license request. The device may also be shipped with the permanent license in the event of a pre-paid fee."
The ordering documents list IEC 61850 as part of an Ethernet module option. SATEC Australia's advice: if the site needs IEC 61850, confirm before commissioning that such a module is fitted and which licence the meter holds.
Firmware and document versions
The installation manual, the operation manual and the IEC 61850 and IEC 62056-21 guides give no firmware version for the meter. The Modbus guide with GOST extensions (BG0475 Rev. A8) says "Applicable to F/W versions 26.X7.XX" for its first release and "Applicable to F/W versions 26.X8.XX" from Rev. A5. The Modbus and DNP3 guides give firmware only for individual entries, such as a programmable number of energy decimals "with F/W 26.XX.28 and later". The operation manual (BG0451 Rev. A4) carries no date of its own; its PDF file is dated 2015. The Modbus guide's revision history (BG0457 Rev. A11) runs to August 2023. SATEC Australia's advice: record the firmware versions from the Device Info display, and check with SATEC Australia before relying on a feature that matters to your project.
What to send SATEC Australia
SATEC Australia's advice: when you ask about an EM720, include:
- a photograph of the nameplate;
- the full ordering code from the paperwork;
- the modules fitted in slots 1, 2 and 3;
- the serial number, production and calibration dates and firmware versions from the Device Info display;
- whether an IEC 61850 licence is temporary or permanent, if IEC 61850 is used.
Contact SATEC Australia technical support through our contact form.
Sources
- EM720 Installation Manual BG0450 Rev. A6
- EM720/EM720T Operation Manual BG0451 Rev. A4
- EM720 IEC 61850 Communications Protocol Reference Guide BG0459 Rev. A4
- EM720 Modbus Communications Protocol Reference Guide BG0457 Rev. A11
- EM720 DNP3 Communications Protocol Reference Guide BG0458 Rev. A4
- EM720 datasheet (SATEC Australia)
- EM720 brochure
- EM720 eXpertMeter datasheet, © September 2011 (the earlier datasheet; not published on SATEC's websites)
Source review: 22 November 2026.