+61 2 4774-2959
[email protected]
  • About SATEC
  • Billing & Revenue Metering Catalogue
SATECSATECSATECSATEC
  • HARDWARE
    • All Metering Products
    • Current Transformers
    • DC Energy Metering
    • Expansion Modules
    • Frequency Control Ancillary Services – FCAS
    • Multi-Channel Energy Meters
    • NMI Approved Energy Meters
    • Phasor Measurement Unit
    • Power Quality Analysers
  • SOFTWARE
    • Expertpower SaaS – EMS, Billing, Power Quality
    • Meter Data Management (MDM)
    • Power Analysis Software (PAS)
  • SOLUTIONS
    • Automatic Demand Response
    • Disturbance Direction Detection
    • Frequency Control Ancillary Services (FCAS)
    • Large-Scale Generation Certificates (LGCs)
    • NMI Approved Retrofit Energy Metering
    • Phasor Measurement Unit
    • Power of Choice Metering
    • Time of Use (TOU) Control
  • NEWS
  • RESOURCES
  • CONTACT
NextPrevious
SATEC PM180 Universal IED

Distance to Fault Applications

By SATEC (Australia) Pty Ltd | Fault Analysis & Distance to Fault, Product News | Comments are Closed | 1 May, 2023 | 0

This important advantage of the PM180 Digital Fault Recorder, which has been available for several years, is now explained in a new application note.
The paper explains the context and usage of this application which can save system operators millions, detailing the different systems in which it can be used.

See Application Note here.

Explore related topics:

For Your Industry

  • Electric Truck Charging: Why Depot Metering Is The Key To Managing New Power Demand
  • How Energy Metering Can Reduce The Cost Of Wastewater Treatment

Standards & Compliance

  • NMI Approved Electricity Metering – Overcoming the Impossible is Possible
  • Advanced 3-Phase Power Metering: Optimising Industrial Energy Efficiency & Compliance
  • DC Shunts and AS/IEC Compliance: What You Really Need To Know

Related Reading

  • Class A Power Quality Monitoring: Precision Detection of Voltage Sags, Swells and Impulsive Transients
  • PMUs Explained for WAMS: The Role of Synchrophasors and Why Timing Accuracy Is Everything

Trending in Your Sector

  • Solar Net Metering Explained: How It Works and Why Accurate Metering Matters
  • Metering Accuracy Class “S” – There is a Difference

Trending Outside Your Sector

  • Poor Power Factor: What It Is, Why It Matters and How to Fix It
  • IEEE 519 Explained: A Guide to Harmonics
PM180

NextPrevious

BOOK AN ONLINE MEETING


INDUSTRY NEWS & VIEWS

Get fortnightly updates delivered straight to your inbox.

Energy Management Knowledge Base

NEWS

  • Solar Export Metering: Accuracy Class and Approval Requirements for Net Metering Installations
  • Choosing an NMI Meter for Build-to-Rent Developments
  • Can Your Smart Energy Meter Deliver Data for Detailed Analysis of Your Load Usage Profile?
  • Extended Range CTs With The EM133-XM: Why Utilities Should Specify Headroom
  • Meter Requirements For Embedded Network Billing In NSW: Class, Approval and the 2026 Reforms
SATEC Australia logo

SATEC – Solutions And Technology for Energy Control

SATEC’s presence in Australia brings together 40 plus years of experience and knowledge for Energy Management Solutions.

The culmination of local expertise and SATEC’s Global leadership in metering, power quality analysers and software provides a source of knowledge to satisfy customer’s ever changing demands for today’s Energy and Power Quality Applications.

Quick Find

  • Contact
  • Metering Products
  • Energy Management Software
  • News – Events – Updates
  • Downloads
  • Billing & Revenue Metering Catalogue
  • Current Product Catalogue
  • Energy Management Knowledge Base
  • Terms & Conditions
  • Privacy Policy
  • Privacy Policy – eXpertConnect

Recent Posts

  • Solar Export Metering

    Solar Export Metering: Accuracy Class and Approval Requirements for Net Metering Installations

    Solar export metering explained. Learn the accuracy class and NMI pattern approval rules for net metering installations in Australia and who signs off.

    22 October, 2026
  • Choosing an NMI Meter for Build-to-Rent Developments

    Choosing an NMI Meter for Build-to-Rent Developments

    Choosing an NMI meter for build-to-rent? Learn which meters can legally bill residents, how state rules apply and what to specify for a 15 year hold.

    12 October, 2026
© 2025 SATEC (Australia) Pty Ltd. | ABN 21-142640417 | SATEC® All Rights Reserved
  • HARDWARE
    • All Metering Products
    • Current Transformers
    • DC Energy Metering
    • Expansion Modules
    • Frequency Control Ancillary Services – FCAS
    • Multi-Channel Energy Meters
    • NMI Approved Energy Meters
    • Phasor Measurement Unit
    • Power Quality Analysers
  • SOFTWARE
    • Expertpower SaaS – EMS, Billing, Power Quality
    • Meter Data Management (MDM)
    • Power Analysis Software (PAS)
  • SOLUTIONS
    • Automatic Demand Response
    • Disturbance Direction Detection
    • Frequency Control Ancillary Services (FCAS)
    • Large-Scale Generation Certificates (LGCs)
    • NMI Approved Retrofit Energy Metering
    • Phasor Measurement Unit
    • Power of Choice Metering
    • Time of Use (TOU) Control
  • NEWS
  • RESOURCES
  • CONTACT
SATEC