BFM-II · INPUTS AND SUBMETERS

How BFM-II current inputs, phases and submeters relate

BFM-II manufacturer product photograph
BFM-II manufacturer product photograph

The BFM-II is a multi-channel meter. Its Channel Assignments setup links current inputs to submeters and to the submeter's phase voltage inputs, and the number of inputs linked decides whether a submeter is single-, two- or three-phase.

This page covers the standard BFM-II energy meter described in the BFM II EM and DFR Operation and Installation Manual, BG0588 Rev. A12. It does not cover the BFM-II DFR or the BFM136.

Three things to keep apart

TermWhat the manual describes
Current inputA current input terminal, I1 to I54 in Channel Assignments. The number of inputs depends on the module combination
PhasePhase L1, L2 or L3 in Channel Assignments, which links a current input to the submeter's phase voltage input V1, V2 or V3
SubmeterUp to 54 submeters "with separate measurement and energy registers", numbered #1 to #54 in Channel Assignments

See which BFM-II module combination fits my circuits for the input count of each combination.

How a submeter is built

The manual's path is: select the device site in PAS, select General Setup from the Meter Setup menu, and click the Channel Assignments tab. For each submeter, Phase L1, Phase L2 and Phase L3 each take a current input terminal, I1 to I54, or None.

  • "The number of the selected current inputs for a submeter specifies if it will be a single-, two-, or three-phase meter."
  • "A submeter remains inactive while there are no current inputs associated with the submeter … or until you link another submeter as a source to its energy registers making it a Totalization submeter."

The manual's typical installation drawings show 4LN3 (4-wire 3-element wye, 3 CTs), 4LL3 (4-wire 3-element delta, 3 CTs), 3OP2 (3-wire 2-element open delta, 2 PTs and 2 CTs) and 3OP3 (3-wire 3-element open delta, 2 PTs and 3 CTs) connections. SATEC Australia's advice: follow the drawing for your connection, and assign each current input to the phase whose voltage its conductor carries.

Setting the CT primary

Channel Assignments has a CT Primary, A setting for each submeter, from 1 A to 10000 A. The manual's "Current transformer CT primary setting note" says:

SensorCT Primary setting
HACS 100ACT primary is set to 50A
HACS 400ACT primary is set to 200A
RS5First CT primary current rating multiplied by 2. For a first CT of 1000A/5A, CT primary is set to 2000A

Its footnote says to "specify the HACS ratings assuming a 200% device inputs over range", for both HACS and RS5 module models. In Basic Setup, the Primary current parameter is described as "The HACS primary nominal current of the selected submeter; for information only."

Totalisation submeters

"Each submeter can service current inputs dedicated to a particular consumer (metering submeter) or be used as a Totalization meter for automatic Totalization of energy from different sub-consumers (Totalization submeter)." The manual adds: "Additionally, the BFM II provides four more Totalization submeters (55 through 60) that you can use for Totalization purposes when all 54 metering submeters have been utilized." Indices 55 through 60 are six submeters, not four.

Submeter numbers and network addresses

"Each active submeter in the BFM II is assigned a unique communication address", assigned "in a sequential order starting with the device base address". The manual says: "Always select your submeters (both metering and totalization) in a sequence without gaps so that your device does not occupy unnecessary network addresses." For planning address ranges across several meters, see how to address multiple BFM meters on RS-485 or Ethernet.

"Device setup settings, excluding the alarm setpoints and data log setup, are shared across all submeters. Though you can read or write them using any submeter address, your changes affect all submeters in the device."

What the factory default is

The manual gives three different pictures of the factory setup:

  • section 2.9.2: "By default, your device is configured for 6 three-phase metering submeters", with a CT primary of 50A for HACS models or 10A for RS5 models;
  • section 2.9.3: "Your device is factory preset to address 1 and occupies the range of addresses 1 through 6";
  • section 4.8.2, footnote 5: "The device is pre-configured for eighteen three-phase submeters as shown in the picture", while that section's screenshot shows submeters #1 to #12 assigned to inputs I1 to I36, and #13 assigned again to I1 to I3.

For RS5 module models, footnote 6 says "The device inputs are preset for 20A current transformers with a 5A primary nominal rating", which differs from section 2.9.2's 10A.

SATEC Australia's advice: don't rely on any of these defaults. Read the Channel Assignments from the meter in PAS and save them before you change anything, then set each submeter to match your actual circuits and sensors.

Record your assignments

Appendix B, "HACS Connection Template", is a table for recording each sub-consumer's input number, wire colour, cable number and phase. Section B.1.1 has a table for cross-referencing a BFM136 installation to a BFM II (236). SATEC Australia's advice: keep the completed template with the saved PAS setup for the site.

Need help?

SATEC Australia's advice: send us the saved setup, your completed template, and the meter's serial number and firmware version. Contact us through our contact form.

Source review: 22 November 2026.