+61 2 4774-2959
[email protected]
  • About SATEC
  • Billing & Revenue Metering Catalogue
SATEC (Australia) Pty LtdSATEC (Australia) Pty LtdSATEC (Australia) Pty LtdSATEC (Australia) Pty Ltd
  • HARDWARE
    • All Metering Products
    • Current Transformers
    • DC Energy Metering
    • Expansion Modules
    • Frequency Control Ancillary Services – FCAS
    • Multi-Channel Energy Meters
    • NMI Approved Energy Meters
    • Phasor Measurement Unit
    • Power Quality Analysers
  • SOFTWARE
    • Expertpower SaaS – EMS, Billing, Power Quality
    • Meter Data Management (MDM)
    • Power Analysis Software (PAS)
  • SOLUTIONS
    • Automatic Demand Response
    • Disturbance Direction Detection
    • Frequency Control Ancillary Services (FCAS)
    • Large-Scale Generation Certificates (LGCs)
    • NMI Approved Retrofit Energy Metering
    • Phasor Measurement Unit
    • Power of Choice Metering
    • Time of Use (TOU) Control
  • NEWS
  • DOWNLOADS
    • Billing & Revenue Metering Catalogue
    • Current Product Catalogue
    • Manuals & Datasheets
    • Power Analysis Software (PAS)
  • CONTACT
    • About SATEC
NextPrevious
NMI M6-1 Compliant LGC Metering Essentials for Renewable Power Stations

NMI M6-1 Compliant LGC Metering Essentials for Renewable Power Stations

By SATEC (Australia) Pty Ltd | Clean Energy Regulator & LGCs, Featured, Large-scale Generation Certificate (LGC), Renewable Certificates (LGC) Metering, Renewables & Storage, Solar PV, Standards & Compliance, Wind Generation | 0 comment | 1 December, 2025 | 0

Accurate energy measurement is critical for renewable power stations seeking to generate and trade Large-scale Generation Certificates (LGCs). The National Measurement Institute’s (NMI) pattern approval standard, NMI M6-1, establishes the foundation for reliable metering that underpins Australia’s renewable energy market.

For renewable energy generators, compliance with these requirements is not merely regulatory box-ticking, it represents the difference between maximised certificate creation and potential revenue loss. This guide examines the essential components of NMI M6-1 compliant metering for LGC creation, helping renewable energy operators understand how proper metering infrastructure directly impacts financial outcomes and regulatory compliance.

With evolving technologies like battery storage systems introducing new metering challenges, staying current with these requirements has never been more important for renewable energy certificate generation.

Understanding NMI M6-1 Requirements for LGC Metering

NMI M6-1 establishes the pattern approval requirements for electricity meters in Australia, providing the regulatory framework that ensures measurement accuracy and reliability. For renewable energy generators, these requirements take on additional significance when creating Large-scale Generation Certificates (LGCs).

The standard mandates specific accuracy classes based on connection types, with grid-connected renewable installations typically requiring Class 0.5S or better for revenue-grade metering. This accuracy classification is not arbitrary; it directly impacts the quantity of LGCs that can be claimed.

Renewable generators should note that separate metering points are required for generation, auxiliary loads and battery systems to correctly calculate net exported energy. The Clean Energy Regulator (CER) specifically requires metering arrangements that account for all energy flows, including station auxiliary losses.

This means implementing a comprehensive metering strategy that addresses both gross generation and auxiliary consumption with appropriate LGC eligibility calculations. Non-compliant metering can result in disputed LGC claims, financial penalties or exclusion from the renewable energy certificate market.

Key Technical Standards for Compliant LGC Metering Systems

Implementing a compliant LGC metering system requires adherence to multiple interconnected standards beyond just NMI M6-1. These standards collectively ensure that the measurement data used for LGC creation is accurate, traceable and defensible during audits.

Renewable energy operators should familiarise themselves with these requirements early in the project development phase, as retrofitting non-compliant systems can be costly and disruptive. The standards work together to create a framework that maintains measurement integrity throughout the energy production and certificate creation process.

From the physical meter specifications to the methodology for calculating auxiliary loads, each standard addresses a critical component of the overall compliance picture.

Let’s examine the three most significant standards that impact LGC metering implementations for renewable power stations.

NMI M6-1 Pattern Approval and Verification Requirements

The NMI M6-1 standard establishes the pattern approval framework that all electricity meters in Australia should follow. For LGC creation, this standard requires meters to have current Australian pattern approval and verification by a licensed utility meter verifier.

Key aspects include system accuracy which entails current transformers and voltage transformers (where applicable) along with Class 0.5S metering to ensure system resolution and accuracy is maintained. Traceability with calibration certificates and proper sealing of metering equipment are further requirements.

Renewable energy generators should ensure their meters have valid pattern approval numbers that can be verified through the National Measurement Institute database. In addition, electricity meters must have interval data capabilities.

Pattern-approved meters guarantee measurement accuracy within specified tolerances across varying environmental conditions and load profiles, critical for the variable output typical of renewable generation. SATEC’s EM133-XM meter meets these requirements with Class 0.5S accuracy certification specifically designed for LGC applications.

AEMO Metrology Procedures for Grid-Connected Systems

For grid-connected renewable power stations, the Australian Energy Market Operator’s (AEMO) metrology procedures provide additional requirements that complement NMI M6-1.

These procedures address the collection, processing and management of metering data used for market settlement and LGC creation. Critical aspects include data sampling rates, storage requirements, time synchronisation and data validation processes. Grid-connected installations should implement metering that supports remote reading capabilities, maintains accurate time stamping and provides sufficient data resolution to capture generation profiles.

The procedures also specify requirements for managing metering data security and maintaining audit trails, essential for defending LGC claims during regulatory reviews. Renewable generators should ensure their metering solutions comply with the AEMO Metrology Procedure appropriate for their connection point classification.

SATEC’s cloud-based Expertpower system provides compliant data management with secure storage and audit-ready reporting functionality.

CER Guidelines for Calculating TLEG and DLEG Values

The Clean Energy Regulator (CER) provides specific guidance on calculating Total Large-scale Electricity Generation (TLEG) and Deemed Large-scale Electricity Generation (DLEG) values, which directly determine the number of LGCs created. These calculations require accurate measurement of auxiliary losses, including those from inverters, transformers and balance-of-system components.

For complex systems with battery storage, the guidelines mandate sub-metering arrangements that can differentiate between renewable generation and grid-sourced energy flows to and from the battery. The CER guidelines emphasise the need for metering configurations that prevent double-counting of renewable energy and ensure that only eligible generation contributes to LGC creation.

Power stations with multiple generation units or technologies should implement comprehensive metering architectures that isolate each generation stream. Operators should follow the CER-approved methodology for their specific technology type when designing metering systems.

Beyond understanding the technical standards, renewable power station operators face practical implementation challenges when deploying compliant LGC metering systems. These challenges often arise at the intersection of theoretical requirements and real-world conditions. Addressing these challenges proactively can prevent costly rework and ensure smooth LGC validation processes.

Two particularly complex areas require special attention: integrating battery storage systems with renewable generation and establishing accurate measurement of auxiliary loads. Both aspects have significant implications for LGC calculations and require careful metering system design to ensure compliance with regulatory requirements.

Getting these elements right from the beginning prevents disputes with the Clean Energy Regulator and maximises the revenue potential from renewable energy certificate creation.

Integrating Battery Storage Systems with Compliant Metering

Battery energy storage systems (BESS) introduce complex metering requirements for renewable power stations seeking to create LGCs. The fundamental challenge lies in differentiating between renewable-sourced energy and grid-sourced energy flowing into and out of the battery system.

Under CER requirements, only renewable energy exported to the grid qualifies for LGC creation, energy sourced from the grid, stored in batteries and then exported back does not qualify. This necessitates sophisticated sub-metering arrangements with multiple measurement points.

The metering system should track energy flows between the renewable generator, battery system, auxiliary loads and grid connection point. Time-synchronised measurements are essential, as the timing of energy flows determines eligibility for certificate creation. For hybrid systems combining multiple generation technologies with storage, the complexity increases further.

SATEC’s EM133-XM meters support this requirement through multiple communications capabilities and Expertpower cloud integration, enabling comprehensive tracking of all energy pathways. 

Accurate Measurement of Auxiliary Loads for TLEG Calculation

Accurately measuring auxiliary loads is critical for correct TLEG calculations and maximising LGC creation. Auxiliary loads include energy consumed by inverters, tracking systems, cooling equipment, lighting, monitoring systems and other balance-of-plant equipment essential for power station operation.

The challenge lies in implementing a metering architecture that captures all relevant auxiliary consumption without including non-eligible loads. This requires careful analysis of power system schematics and load classifications according to CER guidelines.

Meters measuring auxiliary loads should maintain the same accuracy class as the main generation meters, typically Class 0.5S for LGC applications. For larger installations, multiple auxiliary meters may be needed, with data aggregation systems that combine readings for accurate TLEG determination. Station service transformers often require dedicated metering to account for transformer losses.

SATEC’s interval data collection capabilities ensure proper recording of auxiliary consumption patterns in compliance with Chapter 7 of the National Electricity Rules, while providing the necessary data granularity for optimising station operations and identifying unnecessary auxiliary loads that might be reducing LGC yield.

Ensuring Ongoing Compliance and Maximising LGC Value

Implementing NMI M6-1 compliant metering for LGC creation is not a one-time task but requires ongoing management and periodic verification to maintain compliance. Renewable power station operators should establish robust maintenance and calibration schedules for all metering equipment, keeping comprehensive records for audit purposes.

Regular validation of metering data against expected generation patterns helps identify potential measurement issues before they affect LGC claims. As regulatory requirements evolve, staying current with changes to standards and CER guidelines becomes essential for continued compliance.

When selecting metering equipment, operators should consider not just current requirements but future-proofing for potential regulatory changes and system expansions. Partnering with experienced metering providers who understand both the technical and regulatory landscape of renewable energy certificate creation offers significant advantages.

By implementing comprehensive, standards-compliant metering systems, renewable power stations can maximise the value of their LGC creation while maintaining regulatory compliance.

SATEC Australia provides industry-leading metering solutions specifically designed for renewable energy applications requiring NMI M6-1 compliance and LGC creation capabilities. Our EM133-XM energy meters deliver Class 0.5S accuracy certified for LGC applications, with integrated cloud connectivity through Expertpower for comprehensive data management.

SATEC solutions feature interval data collection per Chapter 7 requirements, multiple communications support and purpose-built firmware for renewable energy installations. Our engineering team offers expertise in designing compliant metering architectures for complex renewable systems, including those with battery storage integration.

Contact SATEC Australia for assistance with NMI M6-1 compliant metering solutions tailored to your renewable power station’s specific configuration and regulatory requirements.

FAQs - NMI M6-1 Compliant LGC Metering Essentials for Renewable Power Stations

Why does my LGC metering need to be NMI M6-1 compliant?

Only pattern-approved, verified meters are accepted by the Clean Energy Regulator and non-compliant metering can lead to disputed LGC claims, penalties or lost revenue.

What accuracy class do I need for LGC metering?

Most grid-connected renewable power stations require Class 0.5S meters and associated CTs/VTs to meet revenue-grade and LGC compliance requirements.

How are battery systems treated for LGC calculations?

Battery storage must be sub-metered so that renewable-sourced energy is clearly separated from grid-sourced energy, ensuring only eligible renewable exports are counted towards LGCs.

What metering is needed to calculate TLEG and DLEG correctly?

You need metering that separately measures gross generation, auxiliary loads and any relevant sub-systems so TLEG/DLEG can be calculated in line with CER guidelines without double-counting.

accuracy class, Large scale Generations Certificates, Large-scale Generation Certificates, LGC compliant meters, lgc metering, LGCs

NextPrevious

BOOK AN ONLINE MEETING

INDUSTRY NEWS & VIEWS

Get fortnightly updates delivered straight to your inbox.

Energy Management Knowledge Base

NEWS

  • Power Metering for Hospitals and Healthcare Facilities
  • Why Choosing the Right Electricity Sub Meter Matters for Accurate Billing
  • Energy Metering for Data Centres and the AI Boom
  • AC vs DC Power: Differences and Applications
  • SATEC EM133-XM Smart Energy Meter With Ethernet Connectivity
SATEC Australia logo

SATEC – Solutions And Technology for Energy Control

SATEC’s presence in Australia brings together 40 plus years of experience and knowledge for Energy Management Solutions.

The culmination of local expertise and SATEC’s Global leadership in metering, power quality analysers and software provides a source of knowledge to satisfy customer’s ever changing demands for today’s Energy and Power Quality Applications.

Quick Find

  • Contact
  • Metering Products
  • Energy Management Software
  • News – Events – Updates
  • Downloads
  • Billing & Revenue Metering Catalogue
  • Current Product Catalogue
  • Energy Management Knowledge Base
  • Terms & Conditions
  • Privacy Policy

Recent Posts

  • Power Metering for Hospitals and Healthcare Facilities

    Discover how power metering helps hospitals improve reliability, cut energy costs and support decarbonisation. SATEC’s metering solutions support critical healthcare facilities.

    10 December, 2025
  • Why Choosing the Right Electricity Sub Meter Matters for Accurate Billing

    Choosing the right electricity sub meter is essential for accurate, compliant energy billing and tenant trust. Discover what to look for and how SATEC’s sub metering solutions can help.

    9 December, 2025
© 2025 SATEC (Australia) Pty Ltd. | ABN 21-142640417 | SATEC® All Rights Reserved
  • HARDWARE
    • All Metering Products
    • Current Transformers
    • DC Energy Metering
    • Expansion Modules
    • Frequency Control Ancillary Services – FCAS
    • Multi-Channel Energy Meters
    • NMI Approved Energy Meters
    • Phasor Measurement Unit
    • Power Quality Analysers
  • SOFTWARE
    • Expertpower SaaS – EMS, Billing, Power Quality
    • Meter Data Management (MDM)
    • Power Analysis Software (PAS)
  • SOLUTIONS
    • Automatic Demand Response
    • Disturbance Direction Detection
    • Frequency Control Ancillary Services (FCAS)
    • Large-Scale Generation Certificates (LGCs)
    • NMI Approved Retrofit Energy Metering
    • Phasor Measurement Unit
    • Power of Choice Metering
    • Time of Use (TOU) Control
  • NEWS
  • DOWNLOADS
    • Billing & Revenue Metering Catalogue
    • Current Product Catalogue
    • Manuals & Datasheets
    • Power Analysis Software (PAS)
  • CONTACT
    • About SATEC
SATEC (Australia) Pty Ltd