# Which PM296 or RPM096 instructions apply to my installation?

> How to tell a PM296 from an RPM096, find the manuals that apply, look at the setup without changing it, and collect what is needed to support or replace a unit.

Source page: https://satec-global.com.au/support/articles/pm296-rpm096-identify-and-documents/

---

PM296 · IDENTIFY

# Which PM296 or RPM096 instructions apply to my installation?

*[PM296 product photograph]*PM296 product photograph from SATEC's product photo library

The PM296/RPM096 power quality analysers share one installation and operation manual, BG0260 Rev. C. The instrument is available in two models: the PM296 with a front-panel display, and the RPM096 with a remote display module, the RDM096.

## PM296 or RPM096?

| |PM296 |RPM096 |
| Display |Front panel: bright LED displays (11 windows, 9-digit energy counters) |Optional Remote Display Module (RDM096): three windows with high-brightness digital LEDs |
| Display connection |On the instrument |Conventional DB15 connector (0.4/1.8/3.0 m cable supplied) |

The manual says the Real Time Clock "is provided in the PM296/RPM096E".

The manual tells you to check the labels on the side of the instrument for the power supply voltage, input voltages, currents, analog output and communication protocol.

SATEC Australia's advice:

- Record the exact model designation from the label, including any letter after the model number.
- Photograph the labels before you do anything else.
- The RDM096 is not an RGM180 or an RPM072, so don't use their instructions.

## The documents that apply

The installation and operation manual, BG0260 Rev. C, covers installation, menus, setup, data display, status information, communications and technical specifications.

There is a separate communication manual for each protocol:

- [Modbus, BG0292 Rev. A2](https://satec-global.com.au/support/documents/doc-3bfc85a532c2/)
- [DNP3, BG0293 Rev. A6](https://satec-global.com.au/support/documents/doc-2e687271ccf7/)
- [SATEC ASCII, BG0291 Rev. A3](https://satec-global.com.au/support/documents/doc-ad9a726e3d35/)

SATEC Australia's advice: BG0260 is not on our Documents page, so ask SATEC Australia support for a copy. Use the communication manual for the protocol your system actually uses.

## Looking at the setup without changing it

The manual describes three primary menus:

- **StA:** "view extended status information which may be useful during installation and in certain applications".
- **OPS:** "for viewing (not editing) the instrument setup options".
- **CHG:** "to initialize or modify the instrument setup, or to clear the accumulated values stored in the instrument".

Entry to CHG can be protected by a password of 4 digits. The instrument is shipped with password protection disabled. Depending on the model of your instrument, some menus may not appear.

On the PM296, the status pages include phase rotation, phase angles, relay status, status inputs, counters #1 to #16 and battery status.

SATEC Australia's advice: to check the setup, use OPS, not CHG.

## Fast reset

The manual says: "When changing data via the front panel is not secured by a password, you can reset the Min/Max registers, maximum demands and total energies from the display mode without entering the reset menu". To do it, you select the page and, "While holding the SELECT key, press and hold ENTER for about 5 seconds. The displayed data is reset to zero". For energies, the page is the energy measurements display, "not a TOU register".

The same fast reset works on a counter page in the Status Information Menu when changing data via the front panel is not secured by a password.

SATEC Australia's advice: when you are only reading values, don't hold SELECT and ENTER together. Record readings with photos.

## Diagnostics

The manual says the instrument "periodically performs self-test diagnostics during operation". If the instrument fails the test, "it discards the last measurement results, and an error code is displayed for one second on all LEDs". The codes are:

| Code |Meaning |Code |Meaning |
| 1 |ROM error |5 |Out of control trap |
| 2 |RAM error |7 |Timing failure |
| 3 |Watch dog timer reset |8 |Normal power up |
| 4 |Sampling failure |9 |External reset (warm restart) |

"Frequent failures may be the result of excessive electrical noise in the region of the instrument. If the instrument resets itself continuously, contact your local distributor".

On the PM296, status page 23 shows "The battery status (NORMAL/LOW)". The User Selectable Options include bAtt, Battery mode, with options OFF (the default) and On, described as "Switches the backup battery OFF/ON".

The communication manuals each describe how to read the firmware version number over communications.

SATEC Australia's advice: record the self-test code, battery status and firmware version when you contact us. Don't change Battery mode unless SATEC Australia has advised you to.

## Records and memory

The manual lists event and data logging "with real time clock and 1-Mbyte non-volatile memory", with load profile logging at 5, 15 or 30 minute intervals. The memory table on the same page totals 524288 bytes.

SATEC Australia's advice: because the manual gives two different memory figures, don't rely on either to work out how far back your records go. Read the actual log setup and retrieve the records before anything is changed or removed.

For how PAS shows this meter's menus and recording, see the PAS pages on [PM296 menus](https://satec-global.com.au/support/pas-university/meter-menus/pm296/) and [PM296 waveform recording and memory](https://satec-global.com.au/support/pas-university/waveform-memory/pm296/).

## Planning a replacement

Figure 2-1 of the manual shows a PM296 front-mounting cut-out of 272.0 mm by 176.0 mm, each plus or minus 1.0 mm.

SATEC Australia's advice: before you plan a replacement, collect the following.

- Photos of every label, and the exact model designation.
- Whether there is an RDM096 display, and the length of its cable.
- The firmware version, read over communications.
- The as-found setup, saved with PAS or recorded from the OPS menu: wiring mode, PT ratio, CT primary, demand settings, communication port settings and any alarm or output settings.
- The logs, uploaded and saved.
- Which relays, status inputs and analog outputs are wired, and what they do.
- What the communication ports connect to, such as SCADA, a BMS or a modem, with the protocol, address and baud rate.
- The actual panel cut-out, measured on site.

SATEC Australia's advice: a replacement meter may not fit the same cut-out, wiring or communications without changes. Talk to us before ordering.

## Getting help

Contact SATEC Australia technical support through our [contact form](https://satec-global.com.au/contact/).

Source review: 22 November 2026.

[Contact SATEC technical support](https://satec-global.com.au/contact/)

[Back to Knowledge Base home](https://satec-global.com.au/support/#top)
